Liberty Power Park

Campus ledger

412.0 MW uncommitted

8/8 bays open

309 days to first delivery (2027)

412 MW today · expandable to 5+ GW · Bradford County, PA

Pick a bay.
It energizes in 2027.

Eight liquid-ready halls with generation on the same parcel — lease them or own them, pre-construction. Click any numbered roof below for specs, interiors, and pricing.

Liberty Power Park campus — eight numbered halls in front, LM2500 plant and switchyard at the rear
Dual-use campusBehind-the-meter power to the halls first — surplus sold into the PJM grid for a stronger, more reliable network.

Why this campus

The date, the meter, and the headroom.

The date is firm

First delivery 2027

Generation is on the parcel, so there is no interconnection queue in the critical path. The COD is a construction schedule, not a study result.

309 days to first delivery

Behind the meter

Power on the same parcel

Nine LM2500+G4 machines in combined cycle feed the halls directly. Every published rate is powered — the megawatts are inside the number.

Room to grow

Expandable to 5+ GW

The campus is sized for what is built; the land is not. Ample land for future phases means an anchor here is a position, not a ceiling.

412 MW built · 5,000+ MW of land

On-site generation
412 MW
On-site generation
Target COD
2027
Target COD
Per hall
51.5 MW
Per hall
WUE
0.00
WUE

The only spec that is scarce

Everyone is selling megawatts. We are selling the date they turn on.

Liberty Power Park is not waiting for an interconnection queue, because the campus does not need one to run. Nine machines sit on the same parcel as the halls.

  1. Liberty Power Park

    Energized · take power

    2027

    Generation on the parcel. No interconnect in the critical path.

  2. Queued colocation

    Still waiting

    2030+

    Capacity exists, but the block you need is already spoken for.

  3. Greenfield + new interconnect

    Still waiting

    2031+

    Land, then a service request, then a system impact study.

  4. Grid path needing transmission upgrade

    Still waiting

    2032+

    Network upgrades are assigned, engineered, then built.

Liberty's bar is our own construction schedule to first delivery at DC-01. The three comparison bars are industry-typical planning ranges for a large load in PJM — they are illustrative, not quotes, and your own queue position may be better or worse.

How it works

Three steps from here to a term sheet.

  1. 1Pick a modelBring your own chips and buy powered shell by the megawatt — or take a bay turnkey, delivered running.
  2. 2Configure and price it liveChoose a bay, a kit or a load. Every figure on screen is the real pricing engine, not a brochure number.
  3. 3Request a term sheetSend the exact setup you built. David replies directly, usually same day, priced at the tier open today.
Start configuring

Project status

Bradford County, PA

Land control secured

Gas secured

230 kV ROW on parcel

County use confirmed

Fully entitled · Jan 2027

First delivery · 2027

Full status

Pre-construction pricing

The rate is best before the risk is gone.

  1. Anchor

    Pre-financing · first 2 halls

    $1.8M/ MW / yr

    Ask about this tier

  2. Pre-entitlement

    Before full entitlement · target January 2027

    $1.98M/ MW / yr

    Ask about this tier

  3. Pre-COD

    Construction through first delivery

    $2.16M/ MW / yr

    Ask about this tier

  4. Post-COD

    After DC-01 energizes

    Market

Indicative powered rates on a 10-year take-or-pay. Power is inside every figure here and is not optional — about $48.7 M of a full bay’s annual rate is 487,231 MWh at $100/MWh, generated on the parcel. Published band is $1.8M$2.4M / MW / yr. Not a posted tariff and not an offer — the term sheet sets the rate.

Also on the table pre-construction

Structure, not just rate.

These matter more than a dollar off the wrap for most operators, and they are negotiated on the term sheet rather than posted here.

Ramp schedule
Pay for megawatts as you energize them instead of the full allocation on day one.
Your fit-out ramps over quarters. Billing that tracks the ramp costs us far less than it saves you.
Expansion right of first refusal
The adjacent bay is held against your growth before it goes to anyone else.
Bays are equal and adjacent by design. Reserving the neighbour costs the campus nothing today.
Escalator relief
2.5% annual in place of the standard 3.0%, with a CPI collar available.
Half a point compounds hard over fifteen years. Early signers get the benefit of that math.
Abatement at COD
Rent relief across your commissioning and burn-in window at first energization.
The hall is ramping anyway. You should not pay full freight while you are still proving the floor.
Full lease terms

Talk to us

Tell us how many megawatts and when.

That is the whole first conversation. You do not need to pick a bay or configure anything to start.

Contact us
david@acquisllc.com203-536-6722

David Connolly · Liberty Power Park LLC