Liberty Power Park

Campus ledger

412.0 MW uncommitted

8/8 bays open

309 days to first delivery (2027)

Campus · eight numbered halls

Click a hall. Walk the inside.

Hover lights the building. Click opens interiors, video, specs, and a term sheet.

Lease a hall
Liberty Power Park campus — eight numbered halls in front, LM2500 plant and switchyard at the rear
Dual-use campusBehind-the-meter power to the halls first — surplus sold into the PJM grid for a stronger, more reliable network.

Schematic · L-1.1

The floor plan the halls are built to.

Drawing L-1.1 · Rev. R20 · preliminaryNorth ↑ · eight equal 200′ × 200′ halls
200′ evergreen bufferDC-01200′ × 200′DC-02200′ × 200′DC-03200′ × 200′DC-04200′ × 200′DC-05200′ × 200′DC-06200′ × 200′DC-07200′ × 200′DC-08200′ × 200′Power block 412 MW CC9 × LM2500+G4230 kVGatePENELEC 230 kV ROW · dual-use path
8 equal halls · 40,000 SF 9 × LM2500+G4 Switchyard / gatePreliminary · not for construction

Each hall

40,000 SF

200 × 200 ft · eight equal bays · ~51.5 MW

DC-01

First delivery

Same envelope · 400 kW–1 MW liquid as the density target

Campus

320,000 SF

412 MW nameplate · 8 × ~51.5 MW · BTM

Future phases

The campus is sized for what is built. The land is not.

Ample land for future phases — the site is expandable to 5+ GW. An anchor position in phase one is a position in everything that follows.

Any bay, any size

Want more than one bay? Say the number.

Bays are equal and adjacent by design, so a larger take is a bigger allocation rather than a different conversation. You do not have to choose one to start.

Contact us
david@acquisllc.com203-536-6722

David Connolly · Liberty Power Park LLC