Four steps: pick a business model, pick a bay, set the kit, and the floor math answers live. 40,000 SF · 51.5 MW IT · closed-loop liquid to the flange.
White space 28,000 SF / 777 slots at 36 SF each. NVL72 is 1 slot (142–190 kW). Helios, Ironwood, Trainium3, MTIA, and 400–600 kW Kyber are 2 slots. 1 MW 800 VDC racks are 3 slots. High density is always power-bound in this hall. Closed-loop DLC, campus dry coolers, zero water. Planning figures, not a quote.
DC-06 · step 1
$323.9 M/ yr
Skip the kit
Not ready to spec racks? You do not have to.
The configurator is here if it is useful. If you would rather just tell us the megawatts and the date, that is a faster way in.