Liberty Power Park

Campus ledger

412.0 MW uncommitted

8/8 bays open

309 days to first delivery (2027)

Campus and the Route 6 corridor through Bradford County

Network

Close enough to matter. Far enough to build.

Training does not care about three milliseconds. Inference, replication, and your control plane do. Bradford County sits inside a single-digit millisecond envelope of the Northeast's peering, without paying Northern Virginia's power price or waiting in its queue.

Latency envelope

The physics floor from this parcel.

Round trip from the parcel Out Back
  1. Philadelphia, PA

    142 mi

    3.0 ms

    PJM market centre

  2. New York, NY

    146 mi

    3.1 ms

    Financial + eyeball networks

  3. Ashburn, VA

    196 mi

    4.2 ms

    US-East cloud gravity

  4. Toronto, ON

    198 mi

    4.2 ms

    Canadian peering

  5. Boston, MA

    279 mi

    5.9 ms

    Research + biotech

  6. Chicago, IL

    576 mi

    12.2 ms

    US-Central interconnect

Speed-of-light floor in fibre for the route length shown. A real circuit adds regeneration, switching, and route slack — treat these as the ceiling on what is achievable, not a service level.

Distances are terrestrial route estimates from the parcel.

Open diligence

What we will not claim yet.

Carrier commitments get named when they are signed, not when they are hoped for. Here is the honest state of the fibre workstream.

Long-haul carriers on route
Route study underway — carriers named at NDA
Diverse physical entrances
Two entrances designed; paths confirmed at final design
Dark fibre availability
IRU pricing requested
On-net date
Targeted ahead of DC-01 COD

Next step

Route study and carrier detail go out under NDA.

Tell us the markets you need to reach and we will share the workstream as it stands — including what is not signed yet.

Contact us
david@acquisllc.com203-536-6722

David Connolly · Liberty Power Park LLC